Monday, October 24, 2011

First floor ceilings work

Most of the activity on site last week was at the first floor level, with conduit, ductwork, and ceiling framing being installed during Thursday's site visit. The first floor ceiling will contain a rather complex series of curves, ovals, and soffits, some of which are taking shape in the following photos. Additionally, metal stud partitions are beginning to define some of the enclosed spaces, including the restrooms and study rooms.


View from the southwest


West elevation

Northwest corner

Beginning of the curved ceiling soffit framing

In the lobby, facing west
Ceiling over the open Information Commons space