While work continues on the first floor ductwork, piping, and ceiling soffit framing, the second floor roof framing is now progressing as well. The steel beams which will form the two-level flat roof over the reading room "bridge" are now in place, and bar joists now span over all major spaces.
|
View from the southwest |
|
West elevation; steel beams and bar joists now visible at second floor roof |
|
North (future) building entrance |
|
Second floor roof framing |
|
Second floor reading room |
|
Lobby ceiling soffit framing |
|
Soffit and wall framing for first floor study rooms |